Gary Wilde, Technical Services Officer at the British Pump Manufacturers Association (BPMA) offers some basic information and guidance on purchasing, maintaining, and designing pump systems for optimum energy efficiency, CO2 reduction and capital expenditure payback time.

Given the global rise in energy costs, there has never been a better time to review and assess the efficiency of your pumping systems – whatever their size, complexity or indeed area of operation.

Pump systems account for 20% of the worlds electrical energy demand and between 25% - 50% of the electrical energy usage in certain applications. Pumps are the single largest user of electricity within industry across the European Union, consuming over 300 TWhpa of electricity, which in turn accounts for over 65 Mton of CO? emissions.

It is also well documented that rotodynamic pumps which account for 80% of the installed base are between 20-30% oversized. There is therefore a major potential to save energy if rotodynamic pumps are properly sized and operated.

Where to start - Assess the potential for savings

To identify if a pumping system is sized correctly make the following checks;

• Are you wasting liquid flow?

• Are you creating additional pressure?

• What is the monitoring & controls philosophy?

• Are there any oversized pumps installed for your required duty?

• Are there any old pumps employed in the system?

• Is there excessive noise in the system?

• Are there any throttling valves installed in the system?

• Have you the correct size of pipework installed?

• Inadequate maintenance lowers pump system efficiency, so what maintenance procedures are in place?

• Are you adopting a proactive equipment replacement programme to current EU legislation

Available Technology - Choosing the right equipment

Understanding Drive Technology: Use latest EU regulation to achieve best possible drive efficiency;

• Variable speed drive (vsd)

• Integrated control and monitoring

Choose your supplier - Making the right choice

This article does not suggest or promote any single supplier or technology. It does however recommend that you choose a supplier that is a member of the BPMA, and as such offers the assurance that it operates within the organisations agreed standards and Code of Practice.

The vast majority of existing pump systems operating today were not originally designed with energy conservation as a major consideration. If pump systems are initially designed on an energy efficient basis and pumps are correctly applied and sized the energy savings will often be in excess of 50%.

To design an energy efficient pump system all the following criteria should be considered:

• Pipe size, configuration, and restrictions to limited pipe work losses

• Information on the liquid, (viscosity, density, aggressiveness, temperature)

• System characteristics and pump selection

• Avoid oversizing of the pump units

• Selecting the most energy efficient pumps at the best efficient point

• Fitting VSD’s to match the system design & demand

Reduced energy costs are a direct result of selecting the correct pump and matching it to the system.

When selecting a pump, it is important to determine the required flow and pressure to be generated by the pump. The flow may be determined by a process requirement, by the heating or cooling required in the system or by the peak water demand for utilities. The pressure required may be to elevate the liquid within the system or to overcome the pressure losses in the system created as liquid passes through it.

It is important to know as much about the pump system as possible and to create a pressure/flow profile for the system. The energy required to drive the pump is directly related to the flow and pressure required. To generate high pressures generally leads to designs which may be inefficient and therefore it is important that neither the flow nor the pressure is over specified.

Variable speed drives can save energy

It is estimated that significant energy savings have already been made by using Variable Speed Drive and High Efficiency motors. Generally, Variable Speed Drives are used to continually adjust the speed of the pump to the demand.

The savings can be determined by the affinity laws:

Q= Flow, H= Head, P = Power and n = Rotational Speed

When building a new pumping system, most Pumps are selected with a “safety factor” for potential future uprates or to allow for wear in the pump or fouling of the system. Often there are many different parties involved in specifying and building a system and the safety factor can grow exponentially. This results in the pump delivering much higher flows than required. There may also be the need to vary the flow due to process conditions or varying heating and cooling needs within buildings.

Traditionally, throttling is used to regulate flow in a pumping system. While throttling reduces the flow, the motor is still running at full speed and works even harder as it must work against a restriction. By reducing the speed of the motor, the variable speed drive ensures no more energy than necessary is used to achieve the required flow. A centrifugal pump running at half speed consumes only one-eighth of the energy compared to one running at full speed. Utilising an Electrical Variable Speed Drive is the simplest and most economical way of controlling the pump and matching it to the pump system.

When specifying a new pump, ask for a high efficiency motor to be fitted. If you are replacing or rewinding a motor, then evaluate the cost of fitting a High Efficiency motor remembering to factor in the running savings which will pay back any increase in cost. Invest in carrying out an energy audit. Review your utility bills and understand the energy you are using. Carry out an audit if:

• Your energy bills are high

• You have continuously operating pumps

• You have many pumps in the system

• You have processes with varying flows

• You have throttled pumps

• You have pumps which are on bypass

• You have noisy valves or pipework

• You have critical systems which have been subject to breakdowns

The purpose of an energy audit is to reduce operating costs by reducing energy consumption and the government has estimated that most companies can reduce their energy consumption by 10% to 20%. Energy audits conducted by BPMA members have shown that savings from 30% to 50% are not unusual. When deciding whether or not to carry out an energy audit a good starting point is to assume that you will save at least 10% of your current energy consumption. By reviewing utility bills, you can get an indication of the savings to be made and the investment that you should be prepared to put into the auditing process.

Across most industrial sites, some two-thirds of the total energy consumption is used to power electric motors. Furthermore, the overall cost associated with operating these essential pieces of equipment throughout their entire life span can be broken down as follows; 5% accounts for the initial purchase/installation costs, 10% for ongoing maintenance and a massive 85% for the energy used to run them. Clearly, any reduction in the energy consumed by electric motors is important, and with modern designs that reduction can be as much as 30%. It is also evident that many pumps and motors are constantly operated at full power, irrespective of process needs, and so across the installed base there is the potential for significant energy savings; savings which can in turn drop to the bottom line and increase the profitability of any business.

For further information please visit: www.bpma.org.uk

https://www.linkedin.com/company/bpmapumps/

With major cyber security breaches making the news in recent weeks, the various scares highlight the importance of protection for manufacturers, and at the recent Hannover Messe, cyber security was a major theme for this year’s event.

To view a digital copy of the latest issue of Plant & Works Engineering, click here . View the past issue archive here . To subscribe to the journal please click here .